Hyrdoseeding Case Study

The project scope was to Hydroseed 6900m2 of batters round a tunnel portal to establish grass land to stabilise soil and prevent wash off.

Fibre matrix was added to mix to give enhanced stabilisation until growth was established.

The seed mix and matrix were deployed using flexible hoses allowing full coverage of the area without the need to work at height.

The work was completed in a single shift.

Hydroseeding Project
Establishing grass land to stabilise soil and prevent wash off by hydroseeding 6900m2 of batters round a tunnel portal.